Page 1

© This document is the property of Dolphin Energy Limited. No part of this document will be reproduced or transmitted in any form or by any means, or used
for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Limited.

File Name: S-000-1654-001_C05_0001

1 of 200




DOLPHIN PROJECT


UPSTREAM AND COMPRESSION

FACILITIES

Contractor’s Job Code:
0-3356-20








Rev. Issue Date Purpose/Description of Revision Prepared Reviewed Approved Company

A01 06FEB04 1st Issue For Approval H. Simon M. Harada K. Kamiyama

A02 09MAR04 2nd Issue For Approval, Revision of all Pages H. Simon M. Harada K. Kamiyama

A03 23MAR04 3rd Issue For Approval, Revision as Highlighted H. Simon D. Crawford K. Kamiyama

A04 30MAR04 4th Issue For Approval, Revision as Highlighted H. Simon D. Crawford K. Kamiyama

C05 30MAY04 Approved For Construction H. Simon D. Crawford K. Kamiyama


Contractor Document. No.

S-000-1654-001<C05>



























Company Document No. RL0-0000-FPG-50001

Document Class. 1

Area: MULTI AREA RAS LAFFAN

Discipline: CONSTRUCTION

Document Type: PLAN

Commitment Number: UCB 15-01

Document Title:

Construction HSE Plan


RELEASED

____
_

|
|

|
|

____
_INDRA

05-JU
N-20

04

Page 2

DOLPHIN PROJECT Company Doc. No.: RL0-0000-FPG-50001
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
CONSTRUCTION HSE PLAN Contractor Doc. No.: S-000-1654-001 <C05>



2 of 200
File Name: S-000-1654-001_C05_0001





Note:
A revision line in the right hand margin denotes revisions.



REVISION HISTORY

REV DATE DESCRIPTION

A01 06FEB04 1st Issue For Approval

A02 09MAR04 2nd Issue For Approval, Revision of all Pages

A03 23MAR04 3rd Issue For Approval, Revision as Highlighted

A04 30MAR04 4th Issue For Approval, Revision as Highlighted

C05 30MAY04 Approved For Construction with Revision as Highlighted





____
_

|
|

|
|

____
_INDRA

05-JU
N-20

04

Page 100

DOLPHIN PROJECT Company Doc. No.: RL0-0000-FPG-50001
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
CONSTRUCTION HSE PLAN Contractor Doc. No.: S-000-1654-001 <C05>



100 of 200
File Name: S-000-1654-001_C05_0001

Area within close proximity of the affected area (500 metres) will be warned well in advance on the date
and time of blasting work; affected area will be cleared of flora of height exceeding 50cm and protected
lizards or its burrow will be removed and cleared in advance. Red flags and warning signs surrounding
the perimeter of the affected area will be erected and audible pre-warning sirens and security staff will be
put into place to ensure the safety of the local population are protected.

2.5.4 Hazardous Substance and Materials

Hazardous materials and waste are defined by virtue of their concentration of constituents and
characteristics such as flammability, corrosiveness, reactivity, toxicity, mutagenity, radioactive that will
posed a hazard to human or environment health and well being if improperly managed.

Hazardous materials and wastes are mainly liquid such as chemicals, solvents, paints and fuel/oil. Solid
hazardous waste includes radioactive source and medical waste.

Measures in storage, handling, transportation and disposal will include:

• Provision of designed storages to contain spill, protect against run-off and the spread of fire.

• Construction of impermeable dike with 110% retention capacity of the largest container or tank
stored.

• Provision of suitable containers or storage tanks of compatible material to hold hazardous
materials and waste prior transportation.

• Hazardous material and waste containers or tanks to be prominently marked and labeled in
accordance to its properties and characteristics in the Material Safety Data Sheet provided by the
supplier/manufacturer prior transportation.

• The frequency for collection and disposal of non-hazardous waste will depend very much on the
amount of waste generated during construction phase.

• The amount of waste collected and disposed will be documented in accordance to an inventory
system.

• Trainings will be provided to workers handling hazardous materials and waste. Training will
includes topics such as the selection and used of appropriate personal protective equipment.

All hazardous materials and waste handling, storage and use will comply with the requirements set out in
Waste Management Procedure (Doc. Ref. No.: S-000-1654-126), Chemical Management Procedure
(Doc. Ref. No.: S-000-1654-127) and Spill Management Procedure (Doc. Ref. No.: S-000-1654-128).

2.5.5 Off Site Safety

The purpose of this Section is to establish safe system of work for work carried out outside the Grass Root
Area within another part of JGC area of responsibility (eg. Pipe and Cable Corridor Area), on another
Contractor’s premises and on private property outside of RLC. A separate Off Site Working Procedure
(Doc. Ref. No.: S-000-1654-120) will be developed and submitted to Dolphin.

JGC employees and Subcontractors personnel working on the above said premises will be made aware
of the working environment and hazards within such areas and the preventive and mitigations measures
required to avoid exposure to such hazards and risks.

Responsibilities of JGC

JGC will be responsible to ensure safe working conditions for the workforce. Proper and adequate
supervision will be provided when work is to be carried outside the Grass Root Area. The assigned
workforce will receive adequate HSE training to prepare them for such tasks.

____
_

|
|

|
|

____
_INDRA

05-JU
N-20

04

Page 101

DOLPHIN PROJECT Company Doc. No.: RL0-0000-FPG-50001
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
CONSTRUCTION HSE PLAN Contractor Doc. No.: S-000-1654-001 <C05>



101 of 200
File Name: S-000-1654-001_C05_0001

Workforce performing work off site will be fully informed of the potential hazards and its prevention and
mitigations measures as appropriate to the course of action through ad-hoc meeting and toolbox meeting.

Affected Contractors will be fully and formally made aware of intended work to be carried out within their
premises. Information provided to affected Contractors will include the submission for their information a
work method statement and risk assessment report in the format enclosed in Appendix 8.

2.5.6 Plant and Equipment Inspection and Maintenance

All equipment will be supplied in a safe condition suitable for its intended purpose, identified with a unique
project ID code, with appropriate valid certification and test records. (Refer Site Security and Access
Program - Doc. Ref. No.: S-000-1654-109).

This restriction will not apply to the delivery vehicles with their own lifting equipment. Supporting mobile
cranes use for unloading the above construction plants, machineries and equipment will be subjected to
the requirements of this program.

Equipment will be fit for purpose, safe to use and not cause unexpected pollution during its operation or
transport to site.

DOLPHIN will have the right to order non-compliant equipment to be withdrawn from service until
repaired or replaced.

JGC will facilitate Dolphin’s right to inspect all equipment, providing all necessary documentation to
demonstrate that the equipment is certified as suitable for its’ intended use.

Equipment brought to site by Subcontractors will be inspected by JGC, any sub-standard condition
equipment or plant will not be permitted entry into the site and replacement is required with acceptable
equipment or plant in a timely manner at no additional cost.

All vehicles, plant and powered equipment will be well maintained and adequately silenced to minimize
noise, leaks and emissions.

Suitably designed Drip trays will be used to eliminate fuel release to the environment from all sources of
vehicles and fuel-powered equipment in use.

Vehicle speeds will be kept as low as practicable to minimize dust generation.

Pumps, generators and other mobile equipment will be sited as far as practicable from accommodation
and other noise sensitive locations.

ALL Equipment will be switched off when not in use, or if practicable when left unattended.

A variety of mobile construction plants, machineries and equipment will be used during the Construction
Phase.

Construction plants, machineries and equipment will include but not limited to the following:

• Fork Lift Trucks

• Dumper Trucks, Earth Moving Trucks and Waste Collection Trucks

• Shovels and Excavators

• Cranes (Mobile, Gantry and Overhead)

• Mobile Platforms

• Welding Generators, Power generators, Steam generators and Air Compressors ____
_

|
|

|
|

____
_INDRA

05-JU
N-20

04

Page 199

DOLPHIN PROJECT Company Doc. No.: RL0-0000-FPG-50001
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
CONSTRUCTION HSE PLAN Contractor Doc. No.: S-000-1654-001 <C05>



199 of 200
File Name: S-000-1654-001_C05_0001

Component Sample
Locations

Method /
Equipment

Sample
Frequency

Parameters Permissible Limit Reporting to Dolphin / RLC



Turtle nesting
areas,
general
project areas



Visual
Observations

Activities

Periodically



Rare and Endangered
Species (i.e., turtles, lizards,
avifauna)


No disturbance to rare
and endangered
species


Quarterly

____
_

|
|

|
|

____
_INDRA

05-JU
N-20

04

Page 200

DOLPHIN PROJECT Company Doc. No.: RL0-0000-FPG-50001
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
CONSTRUCTION HSE PLAN Contractor Doc. No.: S-000-1654-001 <C05>



200 of 200
File Name: S-000-1654-001_C05_0001

Appendix 17: Rare and Endangered Species

PICTURES OF RARE AND ENDANGERED SPECIES






Spiny-Tailed Lizard Green Sea Turtle Lesser Kestrel
(Uromastyx Aegyptius) (Chelonia Mydas) (Falco Naumanni)





Desert Monitor Lizard Hawksbill Turtle Sooty Falcon

(Varanus Griseus) (Eretmochelys Imbricata) (Falco Concolor)