Download Punjab Irrigated Agriculture Investment Program, Tranche 2 PDF

TitlePunjab Irrigated Agriculture Investment Program, Tranche 2
LanguageEnglish
File Size2.4 MB
Total Pages292
Document Text Contents
Page 1

Environmental Assessment Report

Environmental and Social Impact Assessment
Project Number: 37231
May 2010




Pakistan: Punjab Irrigated Agriculture Investment
Program, Tranche 2



















Prepared by the Government of Punjab, Irrigation and Power Department for the Asian
Development Bank (ADB).

The environmental and social impact assessment is a document of the borrower. The views expressed
herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be
preliminary in nature. Your attention is directed to the “Terms of Use” section of this website.

Page 2

GOVERNMENT OF THE PUNJAB
IRRIGATION & POWER DEPARTMENT



PUNJAB IRRIGATED AGRICULTURE INVESTMENT PROGRAM-PIAIP

 

 
UPDATING FEASIBILITY STUDY FOR REHABILITATION 

AND UPGRADATION OF SULEIMANKI BARRAGE 
 
 

ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) REPORT 

 
May 2010 

 
 
NESPAK‐AAB‐ DMC JOINT VENTURE CONSULTANTS FOR PIAIP 

 

 

National Engineering 
Services Pakistan 
(Pvt.) Limited 

Development and Management 
Consultants 

AAB (Pvt.) 
Limited

Page 146

Updating Feasibility Study for R&U Suleimanki Barrage
Environmental & Social Impact Assessment

NESPAK-ABB-DMC 130

Sr.

No.

Project

component

Description Measures / Actions Responsibility Parameters for

Monitoring

Frequency Cost

Executor Monitor

by a specialized

contractor as

suggested in Waste

Disposal Plan

10 Agricultural

land and crop

destruction.

It is envisage that no

agricultural land is

involved for the

establishing of the

contractor’s facilities i.e.

batching plant, labour

camp, contractor’s

camp, material yard,

workshop etc.

Accidental damage to

the crop or agricultural

land may happen due

to mistake of

contractor’s vehicle

driver or labour.

10.1 Ensure that

destruction of

agricultural land is

avoided by controlling

the work activities and

vehicles movement by

the trained banksman.

CEnv CSCEnv

PMO-

EU

Implementation

of Contractor’s

contractual

obligation

DC

Daily

When required

SFA

10.2 If it is absolutely

unavoidable and

private land or crop

damage from the

contractor’s activities

then the affecties will

be compensated and

SFA completed by the

contractor

CEnv CSCEnv

PMO-

EU

Compliance SFA DC

When required

SFA

11 Any discharge

or diversion of

No graveyard /

archeological site are

11.1 If during

construction such sites

CEnv CSCEnv

PMO-

Site Inspections DC

Daily

Direct Cost

Page 147

Updating Feasibility Study for R&U Suleimanki Barrage
Environmental & Social Impact Assessment

NESPAK-ABB-DMC 131

Sr.

No.

Project

component

Description Measures / Actions Responsibility Parameters for

Monitoring

Frequency Cost

Executor Monitor

water to a

graveyard or

archeological

site.

found in the project

area so no such

situation may occur in

the area.

are found and

discharge or diversion

of water likely to

damage the site then it

is a contractor’s

obligation not to let it

happen.

EU When required

11.2 Solve the problem

by collaboration with

the communities as per

SFA.

CEnv CSCEnv

PMO-

EU

Compliance SFA DC

When required

SFA

12 Electric &

Mechanical

Works.

Renovation of electric

and mechanical

installations of the

existing barrage will be

carried out in situ so

there will be no impact

on the land resources

due to this activity.

No action is required

13 Extended Canal

Closure.

The construction

activities require canal

closure will be

13.1. Ensure that the

extended canal closure

is avoided by planning

CEnv CSCEnv

PMO-

EU

Compliance of

Work Plan



DC

When required

Once a month

BOQ

Page 291

Updating Feasibility Study for R&U Suleimanki Barrage Updating Feasibility Study for R&U Suleimanki Barrage
Environmental & Social Impact Assessment 

NESPAK-ABB-DMC 263

Page 292

Updating Feasibility Study for R&U Suleimanki Barrage Updating Feasibility Study for R&U Suleimanki Barrage
Environmental & Social Impact Assessment 

NESPAK-ABB-DMC 264

Similer Documents