Download Manual Gl317x Rph2 PDF

TitleManual Gl317x Rph2
File Size10.7 MB
Total Pages420
Table of Contents
                            Instruction Manual D1821_EN_01
	Content
Description and operation
	General description of the circuit-breaker L12-0012EN01
	Description of the interrupting chambers L12-105EN03
	Pole operation (interrupting principle) L13-005EN03
	Operating device of circuit-breaker L14-006EN03
	SF6 gas monitoring L20-001EN07
Packaging - Shipping and storage
	Packaging - Identification - Storage L22-051EN01
Installation
	Erection general instructions L30-002EN02
	Tightening torques L31-001EN02
	Erection general procedures L31-003EN02
	Checking for presence of nitrogen (N2) in pole parts L31-064EN04
	Supporting frame assembly L31-137EN03
	Coupling of column and chambers L31-7137EN01
	Tipping down the pole of the circuit-breaker
and vacuum operation L31-721EN03
	Installation of terminals with preparation
of contact surfaces L31-733EN03
	Installation of capacitors L31-748EN01
	Installation of stress-shields
on the interrupting chambers L31-7509EN01
	Lifting and positioning the pole L31-7606EN03
	Installation of operating device L31-7902EN01
	Connection the vacuum pump L31-853EN03
	Installing the synchronous device RPH2 L31-871EN02
	RPH2 - Correspondence between C.B. poles and the network phases and the phase measuring the
reference voltage L31-872EN02
	Vacuum operation L31-881EN03
	Calculation of the SF6 gas filling pressure
for using the pressure gauge (tool) L31-924EN02
	Pre-filling with SF6 gas at 0.05 MPa L31-951EN05
	Filling with SF6 gas L32-007EN05
Commissioning
	Pre-commissioning inspections L34-011EN06
	Commissioning test report RES310M-EN010
	Commissioning check list
RPH2 maintenance RES 310 M RPH2_EN
	Acceptance criteria CA 103-271-3-010
Maintenance
	Maintenance plan L51-004EN05
	Electrical wear limits L51-053EN03
	Electrical contact densimeter threshold inspection L51-108EN05
	Intervention on the operating device L51-304EN04
Annexes
	Tooling and accessories L60-028EN02
	Product safety sheets PS0000_EN_04
		Summary Ps0000EN04
		Working environment Ps0001EN03
		Handling Operations Ps0002EN03
		Pressurized Equipment Ps0003EN03
		SF6 : Use and Handling Ps0004EN03
		Chemicals Ps0005EN03
		Electrical Equipment Ps0006EN03
		Machinery Ps0007EN04
		Operation Ps0008EN04
		Maintenance Ps0009EN04
	RPH2 - Outline drawing 58 001 115-01
	RPH2 - Wiring diagram (2SA0) 58.010.111-16E (2SAO)
	RPH2 - Service manual 58 020 034-EN
	Check-list Commissioning
maintenance RPH2 58 020 035-EN
End of equipment service life D1821_EN_01
	Dismantling and recovery of components
from a circuit breaker L80-000EN02
	Managing of SF6 gas L80-001EN02
	Guidelines for the handling of used SF6 gas
and its secondary products L81-001EN02
Complementary installation procedure
	Supporting frame assembly L31-138EN03
	Lifting and positioning the pole L31-200EN06
	Installation of terminals with preparation
of contact surfaces L31-504EN03
	Installation of capacitors L31-605EN02
	Installation of stress-shields
on the interrupting chambers L31-664EN02
	Coupling of column and chambers L31-7138EN01
	Installation of operating device L31-7902EN01
Company information section
                        
Document Text Contents
Page 1

Content
Instruction Manual

D1821EN/01
1/8

10- 2013
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

GRID

SF6 circuit- breaker
GL317X

With spring operating mechanisms
FK3- 5

This equipment contains Fluorinated Greenhouse Gas (SF6) covered by the Kyoto Protocol, which has
a Global Warming Potential (GWP) of 22200.
SF6 should be recovered and not released into the atmosphere.
For further information on the use and handling of SF6, please refer to IEC 62271: High-Voltage
Switchgear and Controlgear - Part 303: Use and Handling of Sulphur Hexafluoride (SF6).

Administrator First issue Compiled by Approved by
AHT 23- 10- 2013 J. Bossu V. Texier

Page 2

Content
Instruction Manual

D1821EN/01
2/8

10- 2013
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

GRID

This page is intentionally blank.

Page 210

Annexes
Tooling and accessories

L60--028EN/02
3/8

03--2012
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

GRID

Special tools, continued

Table of special
tools, continued

The table below gives the continuation of ALSTOM special tools :

NUMBER DESIGNATION USE

HB0001652002

(x4/station)

LIFTING STRAP
(3m)

Handling of the pole.

HB0001652001

(x4/station)

LIFTING STRAP
(6m)

Handling of the pole.

HBL--02236071

(x4/station)

LIFTING
SHACKLE

Handling of the pole.

HBLD00786901

(x8/station)
WASHER

Handling
of the column.

HBLN55069303

(x4/station)
RING BOLT

Handling
of the column.

HB0004570001

(x1/pole
installed in
factory)

BLOCKING TOOL

Blocking tool of the
pole operating shaft
for replacing the
operating device.

HB0000482002

(x1/station)

CENTRING
SPINDLES

Chambers/column
coupling.

Continued on next page.

Page 211

Annexes
Tooling and accessories

L60--028EN/02
4/8

03--2012
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

GRID

Special tools, continued

Table of special
tools, continued

The table below gives the continuation of ALSTOM special tools :

NUMBER DESIGNATION USE

HB0015532001

(x1/station)
STOP

Chambers/column
coupling.

HB0000571001

(x1/station)
LEVER

Installing the
operating device.

HB0000504001

(x1/station)
PROTECTION

Chambers/column
coupling.

HB0015511001

(x1/station)
COUPLING PIN

Chambers/column
coupling.

HBLN55001903
VACUUM PUMP

110/220V
50 Hz (4,5 m3/h)

Vacuum operation
in pole.

HBLN55001904
VACUUM PUMP

115/230V
60 Hz (4,5 m3/h)

Continued on next page.

Page 419

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

GRID

This page is intentionally blank.

Page 420

GRID

© -

Alstom Grid
HIGH VOLTAGE SWITCHGEAR
130 rue Léon Blum
69611- Villeurbanne cedex - France
Tel: +33 (0) 4 72 68 34 34
Fax: +33 (0) 4 72 68 34 50
www.alstom.com

Similer Documents