Download IEEE/PES Transformers Committee PDF

TitleIEEE/PES Transformers Committee
LanguageEnglish
File Size2.9 MB
Total Pages208
Table of Contents
                            4.1 IEEE PES Calendar of Upcoming Events
4.2 Conference Papers Submitted
4.3 Upcoming Conference Papers and Schedules
	4.3.1 2014 IEEE PES Power Systems Conference & Exposition
	4.3.2 2014 PES General Meeting
4.4 Changes to IEEE PES Conference Paper Rules
	4.5 Panel Sessions
	5.1 Membership Review
	5.2 New Member Applications
	5.3 Committee, Subcommittees, and Working Group Rosters
	5.4 IEEE/PES and IEEE/SA Membership Requirements
	5.5 Committee Membership Maintenance
	5.6 Essential Patent Claims
	5.7 Affiliation
	5.8 Meeting Minutes
Membership Eligibility Requirements
	James Edward Smith
Unofficial Minutes of Fall 2013 Meeting in St. Louis, MO
AGENDA
Old Business
Munich Meeting Minutes were approved.
New business
Meeting Agenda was approved.
Chairman has described the current status of the Guide, commented on the slow progress with contributions and asked the Secretary S, Levin to make a more detailed review of the Draft 1.1. of the Guide.
With no old or new business the Meeting adjourned at 9:15 AM.
Chairman: Hemchandra Shertukde
Vice Chairman: Mathieu Sauzay
Secretary: Sasha Levin
	C57.12.24 Meeting Minutes – October 21, 2013
	11:00 am October 22, 2013
Members Present Company
Guests Present Company
	11.4 Bushing Subcommittee – Peter Zhao, Chair; Eric Weatherbee, Secretary.
		Minutes submitted respectively by,
	11.5.8.1 IEEE PC57.12.01 - Dry Type General Requirements  Chair Tim Holdway
	11.5.8.2 WG Dry Type O&M Guide C57.94 Chair Dave Stankes
The meeting was called to order at 4:45 PM by Chairman David Stankes.
The meeting was convened with 14 out of 21members (enough for a quorum) and 17 guests present with 1 requesting membership.
The agenda was approved unanimously – proposed by Carl Bush and seconded by Roger Wicks.
The chair discussed the timeline of the PAR leading to the end date of Dec 2015.
	11.7.3.5 Working Group on Revision of Low Frequency Tests; Bertrand Poulin, Chair; Bill       Griesacker, Secretary St. Louis, MO – October 22, 2013
1. There were 71 attendees, 22 members and 49 guests present at the meeting; 7 guests requested membership.  More than 50 % of the working group members were in attendance at the meeting, therefore a quorum was present at the meeting.
2. The agenda for the meeting was presented and unanimously approved.
3. A motion was made by the chairman to approve the minutes from the Spring 2013 meeting in Munich, Germany.  The minutes were approved unanimously.
4. TF - PD in Bushings and Instrument Transformers:
a. Nearly completed is the guide material on bushings. In one month will send this section of guide out for comments to members of the task force.  Next meeting will focus on completing CT and PT sections of the guide. With the PAR on PC57.160 approve...
	1. Meeting Attendance
	2. Discussions
	3. Adjournment
	Insulating Fluids Subcommittee:  Chair Susan McNelly Vice-Chair Jerry Murphy Secretary C. Patrick  McShane
		Introductions, Roll Call, Meeting Approvals, and Chair’s Comments
		Introductions by all attendees
		Chair’s comment: The Chair gave a summary on the groups need to follow the Code of Ethics as well as a reminder of WG/TF meeting requirements.  Among these were: a count of any motions not unanimous must be provided including a count of negatives, a 2...
		Roll Call of SC members.
		Roll Call of eligible new members. Three were present and the Chair welcomed them as new members:
		Agenda Approval
		 Motioned by: Jim Graham
		 Seconded by: Claude Beauchemin
		Corrections and Approval of minutes from fall 2012, Milwaukee
		 Motioned by:  Don Cherry
		 Seconded by: Claude Beauchemin
		 SC Vote Outcome: Passed Unanimously
		Corrections and Approval of minutes from spring 2013, Munich
		• Motioned by: Clair Claiborne
		• Seconded by: Don Cherry
		• Outcome: Passed unanimously
		WG & TF Reports Presented at the SC Meeting
			C57.104 – IEEE Guide for the Interpretation of Gases Generated in Oil – Immersed Transformerseting WG Chair Rick Ladroga, Vice-Chair Claude Beauchemin
			C57.106 – IEEE Guide for Acceptance and Maintenance of Insulating Oil in Equipment
			WG C57.121 – IEEE Guide for Acceptance and Maintenance of Less-Flammable Hydrocarbon Fluid in Transformers
			Chair: David Sundin
			WG C57.130 - IEEE Guide for Dissolved Gas Analysis During Factory Temperature Rise Tests
			IEEE C57.139 IEEE Dissolved Gas Analysis in Load Tap Changers
				WG Chair David Wallach, Secretary Sue McNelly
			IEEE C57.147 Guide for Acceptance and Maintenance of Natural Ester Fluids in Transformers
				WG Chair: Patrick McShane, Vice-Chair: Clair Claiborne, Secretary: Jim Graham
			PC57.155 – Guide for Interpretation of Gases Generated in Natural Ester and Synthetic Ester Immersed Transformers
				Chair Paul Boman, Secretary John Luksich
			WG  PC57.637 Guide for the Reclamation of Insulating Oil and Criteria for Its Use
				WG Chair Jim Thompson
			TF on Moisture in Oil
			Chair: Bob Rasor
			The TF Report given at the Sub-Committee Meeting by Claude Beauchemin:
			TF on Consolidation of Insulating Fluid Guides –
			Chair: Tom Prevost
			The TF Report given at the Sub-Committee Meeting by Tom Prevost:
			TF on Particle Count Limits in Mineral Oil
		New Business:
			9. DATE AND PLACE OF THE NEXT MEETING
	ROOM
	CHAIR
	COM
	DATE/TIME
	ROOM
	CHAIR
	COM
	DATE/TIME
	ROOM
	CHAIR
		MEETING
	COM
	DATE/TIME
	ROOM
		SC Instrument Transformers
		SC Distribution Transformers
	CHAIR
	COM
	DATE/TIME
	ROOM
		SC Performance Characteristics
	CHAIR
	COM
	DATE/TIME
	Standards Report Front F2013 D2.pdf
	Standards_Status_Attachment rev102013
	Standards_Org_Chart_rev1 102013
                        
Document Text Contents
Page 1

Transformers Committee

Fall 2013 Meeting – St. Louis, MO
October 19-24, 2013

Renaissance St. Louis Grand Hotel


Chair: Bill Chiu Vice Chair: Donald Platts Secretary: Stephen Antosz
Treasurer: Gregory Anderson Standards Coordinator: William Bartley Past Chair: J. Edward Smith



IEEE/PES
Transformers

Committee



Fall 2013
Meeting Minutes


St. Louis, MO

October 19-24, 2013


Unapproved
(These minutes are on the agenda to be approved at the next meeting in Spring 2014)

Page 2

TABLE OF CONTENTS
1.0 ATTENDANCE
2.0 APPROVAL OF PREVIOUS MINUTES – STEPHEN ANTOSZ
3.0 CHAIR’S REMARKS & REPORT – BILL CHIU

3.1 CHAIR’S REMARKS
3.2 CHAIR’S REPORT

4.0 VICE CHAIR’S REPORT – DONALD PLATTS
5.0 SECRETARY’S REPORT – STEPHEN ANTOSZ
6.0 TREASURER’S REPORT – GREGORY ANDERSON
7.0 AWARDS REPORT – JAMES EDWARD SMITH
8.0 ADMINISTRATIVE SC MINUTES – BILL CHIU
9.0 STANDARDS SC MINUTES & REPORT – WILLIAM BARTLEY

9.1 STANDARDS SUBCOMMITTEE MINUTES
9.2 STANDARDS REPORT

10.0 MEETINGS PLANNING SC MINUTES & REPORT – GREGORY ANDERSON
10.1 MEETINGS SUBCOMMITTEE MINUTES
10.2 MEETINGS REPORT

11.0 MINUTES OF TECHNICAL SUBCOMMITTEES
11.1 PERFORMANCE CHARACTERISTICS SC – ED TENYENHUIS
11.2 POWER TRANSFORMERS SC – JOE WATSON
11.3 UNDERGROUND TRANS & NETWORK PROTECTORS – CARL NIEMAN
11.4 BUSHINGS SC – PETER ZHAO
11.5 DRY TYPE TRANSFORMERS SC – CHARLES JOHNSON
11.6 DISTRIBUTION TRANSFORMERS SC – STEVE SHULL
11.7 DIELECTRIC TESTS SC – MICHAEL FRANCHEK
11.8 HVDC CONVERTER TRANSFORMERS & REACTORS – MIKE SHARP
11.9 INSTRUMENT TRANSFORMERS SC – ROSS MCTAGGART
11.10 INSULATING FLUIDS SC – SUSAN MCNELLY
11.11 INSULATION LIFE SC – BRUCE FORSYTH

12.0 EDITOR’S REPORT – SANJIB SOM
13.0 LIAISON REPORTS

13.1 STANDARDS COORDINATING COMMITTEE NO. 4
13.2 IEC TC14 TECHNICAL ADVISOR TO USNC – PHIL HOPKINSON
13.3 REPORT OF IEC TC14 POWER TRANSFORMERS – PAUL JARMAN
13.4 CIGRE – RAJ AHUJA

14.0 UNFINISHED (OLD) BUSINESS
15.0 NEW BUSINESS
16.0 MEETING SCHEDULE

Page 105

APPENDIX B
WG Revision C57.19.01 Standard Requirements for Bushings.
MINUTES OF WORKING GROUP MEETING – F13 St Louis, MO.

The working group met on Tuesday October 22, 2013, at 9:30 am with a total of 62 participants.
Of those, 13 members and 47 guests with 3 guests requesting membership. Working Group
membership is currently 25 Members therefore we had a quorum.

Eric Schleismann requested membership and his status was changed to member after
verification of participation. Two guests requesting membership were not granted due to
attendance requirements not being met (T Martin, B Beaster).

 The meeting was opened by Peter Zhao with introduction of Dr. Shibao Zhang as new chair

replacing Art Del Rio w David Wallach will serve as secretary.
 Introductions: Attendee introductions and affiliations was performed.
 Minutes Approval (after quorum was obtained)

• F12 Milwaukee meeting were approved as posted
• S13 Munich meeting were approved as posted

 Review of prior work:
• Reviewed F12 Milwaukee meeting minutes as a review of past discussions.
• Reviewed S13 Munich meeting minutes as a review of past discussions.
 Keith Ellis noted that some transformers are not following P and D dimensions on

new transformers coming into the U.S. market resulting in replacement bushing
issues in the future adapting to optimized CTs, etc. Keith Ellis was requested to
write up a 1 page or less summary to clearly describe this concern.

 Users and suppliers have not responded to the call for definition for solid type
bushing and cast insulation bushing.

 Call for dimensions for 5000 A bushings through 230 kV is needed.
 Survey concerning usage of 2000 standard: Doble Engineering assisted the Working

Group with a survey the impact of the change of the year 2000 change to the standard. Six
questions were posed to 112 participants representing 80 companies. Questions focused on
elimination of 25, 115, and 161 kV voltage classes. Results of the survey were reviewed
including the free-form comments from the respondents. The detailed survey results are not
provided in the minutes but are available.

 Higher current bushings: A table will be circulated to collect the values users have been
seeing and suppliers have been providing to circulate to working group in advance of the S14
meeting to allow time to assemble a recommended set of dimensions.

 250 kV BIL Class: An attendee inquired about the status of adding back the 250 kV BIL/46
kV bushing. This can be added to the table as a proposed bushing to supply dimensions in
the future also for comment.

 ERIP Power Factor: Comments about the power factor of ERIP bushings as discussed on
Central Desktop survey were presented by Dr. Zhang. Peter Zhao suggested the information
should be distributed by email to members and guests to consider along with summary and
recommendation.

 Request to add high temperature limit to standard: Request from C57.19.04 since this
standard covers 5000 A and below. High temperature bushings would be out of scope for
this working group.

Page 207

IEEE/PES Transformers Committee
Chair: Bill Chiu

Vice Chair: Don Platts Secretary: Stephen Antosz Treas: Greg Anderson
Past Chair: J. Ed Smith Std. Coordinator: Bill Bartley

INSTRUMENT
Ross McTaggart

HVDC Converter Xfmrs &
Smoothing Reactors

Michael Sharp

DRY TYPE
Chuck W. Johnson

DISTRIBUTION
Steve Shull

BUSHING
Peter Zhao

POWER
Joe Watson

UG & NW Protector
C. G. Niemann

Gen. Req. of Bushings
Rev of C57.19.00

Bushing App. Guide
C57.19.100

OH Dist. Xfmrs
C57.12.20

Eqp Encl. Integrity
C57.12.28, 12.29,

12.30, 12.31, & 12.32

Elec Rpt of Test Data
IEEE 1388/C57.12.37

General Req.
C57.12.01

Req. & Test Code for
HVDC Con. Xfmr

C57.129

Req. & Test Code for
HVDC Smoothing

Reactors IEEE 1277

Step Volt. Regulator
C57.15

Req for Inst. Xfmrs
C57.13

Test Proc. For Inst.
Xfmrs

C57.13.2

Test Req. for >= 115kV
PC57.13.5

Req. for Elect. Rev.
Metering
C57.13.6

Guide for Monitoring
C57.143

Directly Connected
GSU

C57.116

Req. for Liq. Imm.
Power Xfmrs

C57.12.10

Std. Req. for Sec.
Network Xfmrs

C57.12.40

UG 3ph Dist Xfmr
< 2500KVA
C57.12.24

Dry Type Air-Core
Reactors
C57.16

Performance
Characteristics

C57.19.01

Req. & Testing of DC
Bushings
C57.19.03

Req.for Vent.
<=500KVA
C57.12.50

Req.for Vent. >500KVA
PC57.12.51

Req. for Sealed
>500kVA

PC57.12.52

Thermal Eval. for
Dry-Type

C57.12.56 & 12.60

Transient Analysis
C57.12.58

Dry-Type Through Fault
Current Duration

C57.12.59

Test Code
C57.12.91

IEEE 638 – Std for
Class IE Tx at Nuc Gen

Stations

Phase-Shift Xfmrs
C57.135

Eval & Reconditioning
C57.140

Std for Control Cabinet
C57.148

Arc Furnace Xfmr
C57.17

Installation & Maint
Guide C57.93

Vent Dry-Type Network
Xfmrs <=2500KVA

C57.12.57

Req. for 3ph Pad Mount
C57.12.34

UG Self-Cool 1-ph
C57.12.23

Pad-Mount 1ph Self-
Cool <2500kVA

C57.12.38

Bar Coding
C57.12.35

Perf Characteristics for
GSU Bushings

PC57.104

Transportation Guide
PC57.150

Tank Rupture
Mitigation C57.156

P. Zhao

Revised by W. Bartley

Std. Req. for Sec.
Network Protectors

C57.12.44

Requirements for LTC
C57.131

Dry-Type Hottest Spot
C57.134

Dry Type Op & Maint.
Guide
C57.94

Dist. Sub. Xfmrs
C57.12.36

Guide for Paralleling
C57.153

Page 21 of 22

Failure Investigations
C57.125

Functional Life Tests
for DETC C57.157

Req. for mA CT
C57.13.7

Tank Pressure
Coordination
C57.12.39

Revised 10/20/2013

Std Requirements
Phase Shifters

P60076-57-1202

TF for SSVTs
PC57.13.8
D. Wallace

Page 208

IEEE/PES Transformers Committee
Chair: Bill Chiu

Vice Chair: Don Platts Secretary: Stephen Antosz Treas: Greg Anderson
Past Chair: J. Ed Smith Std. Coordinator: Bill Bartley

Insulating Fluids
Sue McNelly

Insulation Life
Bruce Forsyth

DIELECTRIC TEST
Mike Franchek

Performance Characteristics
Ed teNyenhuis

Standards
Wm. Bartley

Req. & Test Code for
Shunt Reactors

>500kVA C57.21

Semicon Rectifier Xfmrs
C57.18.10
S. Kennedy

App. Guide for Xfmr
Connections

C57.105

Sound Level Abatement
C57.136

Impulse Test Guide
for Dist Tx C57.138

J Crotty

Rev of Low Freq. Tests
B. Poulin

Guide for Acoustic PD
C57.127
D. Gross

DGA Guide
C57.104

R. Ladroga

Mineral Oil
C57.106

Silicone Oil
C57.111

DGA During Thermal
Test C57.130
J. Thompson

Less Fammmable
H-C Fluid C57.121

D. Sundin

Loading Guide
C57.91

Don Duckett

TF Investigate Use of
Furan Testing

S. Xu

Max. Wdg Temp Rise
IEEE 1538

Temp Rise Test Above
NP Rating
C57.119

Thermal Eval Test
C57.100

R. Wickes

Cont Rev of C57.12.00
S. Snyder

Cont. Rev of C57.12.90
S. Antosz

Metric Conversion
C57.144
P. Balma

Terminology
C57.12.80
B. Chiu

Meetings
Greg Anderson

Through-Fault Current
Duration C57.109

Non-Sinusoidal Load
Current
C57.110

Xfmr Loss
Measurement

C57.123

Short Circuit Testing
PC57.133

Mitigation of Switching
Transients CB/Xfmr
Interaction C57.142

App. Of High Temp
Insulation IEEE 1276

M. Franchek

DGA in LTC
C57.139

D. Wallach

TF – Moisture in
Insulation
B. Rasor

Oil Reclamation
IEEE 637

J. Thompson

DGA in Silicone
C57.146
J. Murphy

Website Development
S. McNelly

Terminal Markings &
Connections

S. Schull C57.12.70

Diagnostic Field Testing
J. Verner

IEEE C57.152 /(62)

Neutral Grounding
Devices

IEEE32/ PC57.32

Educational
Development
T. Prevost

WG on Dielectric
Test Table

P. Hopkinson

Sound Level
Measurement

PC57.151

TF - Temp Rise Test -
C57.12.90, Clause 11

P. Powell

IEEE /IEC Cross
Reference TF
V. Mehrotra

Revised by W. Bartley

Guide to Freq
Response Analysis

C57.149

PCS Rev to
Test Code- 12.90

PCS Rev. to
Gen Req - 12.00

S. Snyder

PD Measurement
On Bushings & Inst Tx

B. Poulin

Rev of Transient
Voltage Test

P. Riffon/P. Heinzig

WG- External Dielectric
Test Clearance

Eric Davis

Page 22 of 22

WG – Std Req. Hi Temp
Insulation C57.154

R. Marek

DGA in Ester Fluids
PC57.155
P. Boman

TF for Particle Count
M. Scarborough

App Guide for Ester
Fluids -C57.147

P. McShane

Windfarm Transformers
P60076-16

TF – Winding Temp
Indicators
P. McClure

TF – Fluid terminology
consistency
P. McShane

Tertiary & Stabilizing
Windings
PC57.158

DPV Grid Transformers
PC57.159

Revised 10/20/2013

Moisture in Insulation
PC57.162
T. Prevost

Committee
History

P. Balma

WG- Guide for DFR
testing PC57.161

A. Naderian

DPV Grid Transformers
PC57.159

Similer Documents