Download East Riding Local Plan Proposed Submission Strategy Document and Proposed Submission ... PDF

TitleEast Riding Local Plan Proposed Submission Strategy Document and Proposed Submission ...
Author
LanguageEnglish
File Size20.3 MB
Total Pages320
Table of Contents
                            Consultation statement Jan 2014
	2. STATEMENT OF COMMUNITY INVOLVEMENT
		SCI (2007)
		SCI (2013)
	3. LDF PRELIMINARY CONSULTATION (2004-7)
		Introduction
		Approach to Consultation
		The Response
	4. CORE STRATEGY - ISSUES AND OPTIONS (2008)
		Introduction
		Approach to Consultation
		The Response
	5. PREFERRED APPROACH CORE STRATEGY AND POTENTIAL SITES ALLOCATIONS DEVELOPMENT PLAN DOCUMENT (2010)
		Introduction
		Approach to Consultation
		The Response
	6. CORE STRATEGY FURTHER CONSULTATION (2011)
		Introduction
		Approach to Consultation
		The Response
	7. DRAFT LOCAL PLAN CONSULTATION (2013)
		Introduction
		Approach to Consultation
		The Response
	8. DRAFT LOCAL PLAN PROPOSED MAJOR CHANGES (2013)
		Introduction
		Approach to Consultation
		The Response
	9. PROPOSED SUBMISSION STRATEGY DOCUMENT AND ALLOCATIONS DOCUMENTS (2014)
	10.  SA/SEA/SITE ASSESSMENT METHODOLOGY (2006-2014)
		Introduction
		Preparation of the Site Assessment Methodology
		Fact Checking Exercise
		Site Assessment Methodology Update
	11. DUTY TO COOPERATE AND OTHER CONSULTATION (2004-14)
	12. CONCLUSION
All combined
	Appendix1
	_App 2 Combined
		Appendix 2 - title page
		2A - Consultation Timetable
		2B consultation Contacts
		2C Example of Consultation letter
		2D 1 - example of workshop presentation - needs title
		2D 2 - Example of Workshop  Activity with Parish Councils (page1 LSP) needs title  (v2)
		2D 3 - example Youth Assembly - need title (v2)
		2D 4 - Example Youth Assembly 2 need title (v2)
		2E - Examples of Press
		2F - East Riding News - needs title
		2I - Questionnaire needs heading
		2J - Photos - Needs Title
	_App 3 combined
		Appendix 3 - title page
		3a - Consultation Timetable
		3B - consultation contacts
		3c - Example consultation letters
		3d - part 1 workshop
		3d - part 2
		3E - display
		3F - Examples of Press
		3G - East Riding News - size reduced
		3H - Summary Document - size reduced
		3I - poster needs heading
		3J - Questionnaire needs heading
	_App 4 combined
		Appendix 4 - title page
		4A - Consultation timetable
		4B - Further consultation contacts
		4C - Consultation letters
		4D - Example of workshop-presentation - needs heading
		4E - Examples of Press
		4F. Your East Riding - needs title
		4I - questionnaire needs title
		4J - Examples of visioning workshop
			Brough Presentation [Compatibility Mode]
			Elloughton-cum-Brough write up
	_App 5 combined
		Appendix 5 - title page
		5a - consultation timetable
		5B - contacts
		5C - Consultation Letters
		5D. Meeting-presentation - needs heading
		5E - Display needs title
		5f - press
		5G. Your East Riding - Needs title
		5J - Questionnaire - needs title
		5k. Letter to Gypsy and Travellers - call for sites
		5L . Gypsy & Traveller Further Consultation letter
		5N.  Gypsy & Traveller Further Consultation Questionnaire
		5O - Hinterland Village letter
		5P. Hinterland villages workshop
	_App 6 combined
		Appendix 6 - title page
		6A - Consultation Timetable
		6B - Proposed Major Changes Consultation Contacts
		6C - Example of Consultation Letter
		6D - example of drop in session
		6E - Examples of Press
		6F - Your East Riding - Needs Title
		6G - poster Part 2
		6H - Questionnaire - needs title
	_App 7 combined
		Appendix 7 - title page
		7a consultation Contacts
		7b HSAM
		7C - CABE Workshop Report
		7D - Fact check letter and questionnaire
	_App 8 combined
		Appendix 8 - title page
		Appendix8
                        
Document Text Contents
Page 1

East Riding Local Plan


Proposed Submission Strategy Document
and

Proposed Submission Allocations Document


Regulation 17(d) Consultation Statement















January 2014

Page 2

2


CONTENTS

1. INTRODUCTION............................................................................................................... 6
2. STATEMENT OF COMMUNITY INVOLVEMENT .................................................. 8

SCI (2007) ............................................................................................................................... 8
SCI (2013) ............................................................................................................................... 9

3. LDF PRELIMINARY CONSULTATION (2004-7) ....................................................... 11
Introduction .......................................................................................................................... 11
Approach to Consultation ..................................................................................................... 11
The Response ....................................................................................................................... 12

4. CORE STRATEGY - ISSUES AND OPTIONS (2008).................................................. 13
Introduction .......................................................................................................................... 13
Approach to Consultation ..................................................................................................... 13
The Response ....................................................................................................................... 15

5. PREFERRED APPROACH CORE STRATEGY AND POTENTIAL SITES
ALLOCATIONS DEVELOPMENT PLAN DOCUMENT (2010) ................................... 17

Introduction .......................................................................................................................... 17
Approach to Consultation ..................................................................................................... 17
The Response ....................................................................................................................... 19

6. CORE STRATEGY FURTHER CONSULTATION (2011) ......................................... 22
Introduction .......................................................................................................................... 22
Approach to Consultation ..................................................................................................... 22
The Response ....................................................................................................................... 24

7. DRAFT LOCAL PLAN CONSULTATION (2013) ....................................................... 26
Introduction .......................................................................................................................... 26
Approach to Consultation ..................................................................................................... 27
The Response ....................................................................................................................... 29

8. DRAFT LOCAL PLAN PROPOSED MAJOR CHANGES (2013) .............................. 31
Introduction .......................................................................................................................... 31
Approach to Consultation ..................................................................................................... 31
The Response ....................................................................................................................... 32

9. PROPOSED SUBMISSION STRATEGY DOCUMENT AND ALLOCATIONS
DOCUMENTS (2014) ............................................................................................................ 34
10. SA/SEA/SITE ASSESSMENT METHODOLOGY (2006-2014) ................................ 35

Introduction .......................................................................................................................... 35
Preparation of the Site Assessment Methodology .................................................................. 35
Fact Checking Exercise ......................................................................................................... 36

Page 160

Beswick Parish Council

Bettie Willis Centre

Beverley & District Chamber of Trade

Beverley & District Civic Society

Beverley & District Civic Society

Beverley & North Holderness Drainage Board

Beverley Congregation of Jehovah's Witnesses

Beverley Grammar School

Beverley High School

Beverley Manor Road Nursery

Beverley Minster CE VC Primary School

Beverley Partnership

Beverley Pasture Masters

Beverley Renaissance

Beverley Renaissance

Beverley St Nicholas Primary School
Beverley Town Council

Beverley Town Council

Beverley Town Council
Bewholme Parish Council

Bidwells

Bidwells
Bielby Parish

Bilton Community Primary School
Bilton Parish Council

Birdjohnson Associates Ltd

Bishop Burton College

Bishop Burton College

Bishop Burton College
Bishop Burton Parish Council

Bishop Wilton CE VC Primary School
Bishop Wilton Parish Council

Blacktoft Parish Council

Blowers Group

Blue Circle Industries

Boothferry Primary School

Bossall

Bourne Leisure Ltd

Bovis Homes Ltd
Boynton Parish Council

Boynton Primary School
BP Saltend-Teeside Pipeline c/o Bell Ingram
Chartered Surveyors

Bradley Strankler Planning Associates
Brandesburton Parish Council

Brandesburton Primary School
Brantingham Parish Council

Brian Leighton (Garages) Ltd

Bricknell Gospell Halls Trust

Bridlington & District Chamber of Trade

Bridlington & District Civic Society
Bridlington Hotel and Guest House
Assocation

Bridlington Nursery School

Bridlington Regeneration Partnership

Bridlington Samaritans

Bridlington School Sports College

Bridlington Town Centre Residents
Association

Bridlington Town Council
Bridlington Town Council

Briggs Burley

British Cycling Federation

British Ecological Society

British Gas

British Heart Foundation

British Ports Association

British Retailers Association

British Sub-Aqua Club

British Telecom

British Waterways

British waterways

British Wind Energy Association

Broad Lane
Broomfleet Parish Council

Brough Primary School

Brown & Co

Brown & Co

Brown Lawrence Projects

Brown Lawrence Projects Ltd

Bryan Brown & Son

Bryan Brown & Sons

Bryant Homes
Bubwith Parish Council

Bubwith Primary School

Page 161

Bugthorpe CE VC Primary School
Bugthorpe/Kirby U'dale Parish Council

Building Design (Beverley) Ltd

Building Design Architects

Burlington Infant School

Burlington Junior School

Burnett and Sons

Burstwick Community Primary School
Burstwick Parish Council

Burton Agnes CE VC Primary School
Burton Agnes Parish Council

Burton Constable Parish Council

Burton Fleming Parish Council

Burton Pidsea Parish Council

Burton Pidsea Parish Council

Burton Pidsea Primary School

Burton Pidsea Primary School

Business in the Community

Business Link

Business Link Humber

Business Link Humber

BWEA

C B Richard Ellis

C B Richard Ellis

C Bromby (Farms) Ltd

C R Parrott Consultants Limited

C.C.F.D. (Hull) Limited

c/o Jean Scott

c/o Pegasus Planning Group

CAD Associates Ltd

Caldecotte Consultants

Cammish Company

CAMRA

CAMRA East Yorkshire Branch

Capel House Property Trust Limited

Carlton Parish Council

Carnaby Grain Dryers Syndicate
Carnaby Parish Council

Carnaby Parish Council

Carplus

Carter Jonas LLP

Carter Jonas LLP

Carter Jonas LLP

Carter Jonas LLP

Carter Jonas LLP

Carter Jonas LLP
Catton Parish Council

Catwick Parish Council

Cavermill Estates

CB Richard Ellis

CB Richard Ellis

CB Richard Ellis

CB Richard ellis

CB Richard Ellis

CE Electric UK

Central Land Holdings

Centrica Storage Limited (CSL)

Cerda Planning

CGMS Consulting

Charles R Stafford and Son

Chase Hill Lane

Cherry Burton CE VC Primary School
Cherry Burton Parish Council

Chesterton plc

Children & Family Action

Chris Clubley & Co

Chris Clubley & Co

Church Commissioners

Church Lane

Citizen's Advice Bureau

Citizen's Advice Bureau

Citizen's Advice Bureau

Citizen's Advice Bureau

Citizen's Advice Bureau

Citizen's Advice Bureau

City Developments

Civic Trust

Civil Aviation Authority

Clegg & Son

Clegg & Son

Clegg and Son

Cliffe Parish Council

Clugston Developments Limited

Collette Tyler School of Dance

Page 319

Appendix 8


Member’s Seminars

Page 320

Appendix 8 – Member’s Seminars

Date Purpose

Initial consultation with new Member’s on the
LSP and LDF

8 Oct 2007

Initial consultation / visioning with Member’s
(inc workshop)

16 Nov 2007

Core Strategy Issues and Options Member’s
Seminar

16
th
April 2008

Member’s Seminar 1: Housing distribution and
flooding
Member Seminar 2: Affordable housing, rural
economy, roll back
Member’s Seminar 3: Developer contribution,
community facilities, biodiveristy

15
th
September 2008


24

th
September 2008


2

nd
October 2008

Preferred Approach Core Strategy and
Potential Sites Allocations Document
Member’s Seminar

11th May (am) 2010

Member’s Seminar on Reponses to
consultation and Site Assessment Methodology

29 September 2010

Core Strategy Further Consultation Member’s
Seminar

3 Nov 2011

Email to Ward Member’s advising of
forthcoming fact check exercise

24 February 2012

Member’s Seminar on NPPF and
neighbourhood planning

21 June 2012

Member’s Seminar on Draft Local Plan 13 February 2013

Member’s Seminar on response to consultation
and potential actions

13 May 2013

Proposed Submission Local Plan 11 Dec 2013

Member’s have also been informed at the outset of all stages of consultation. Meetings and

correspondence with individual Member’s and Groups of Member’s has taken place as

appropriate.

Similer Documents