SELF-CHECK NO. 2.2-2

Check your mastery in interpretation of plans and details by
completing the tasks below.

IDENTIFICATION. Complete the sentence by choosing your answer on
the phrases below. Write your answer on the space provided.

Check the jamb Measure the distance
Cut the head Nail the side jamb
Cut the head jamb Plumb the jambs
Cut the side jambs Set the jambs
Level the floor

1. ______________________ of an entrance door to the height of the door,
less the depth of the head jamb rabbet (if any).

2. ______________________ to the width of the door, less the combined
depths of the side-jamb rabbets (if any), plus the combined depths
of the head-jamb dadoes (grooves).

3. ______________________across the opening to determine any variation
in floor heights at the point where the jambs rest on the floor.

4. ______________________jamb with both ends square. Allow the width of
the door plus the depth of both dadoes and a 3/16-inch door
clearance.

5. From the lower edge of the dado, ____________________ equal to the
height of the door plus the clearance required under it. Mark it and
cut it square. On the opposite jamb, do the same. Make additions or
subtractions on this side for floor variations, if any.

6. ______________________ and jamb heads together with 8d common
nails, through the dado into the head jamb.

7. ______________________ into the opening. Place small blocks on the
subfloor under each jamb. Blocks should be as thick as the finished
floor will be. This allows room for the finished floor to go under the
door.

8. ______________________ and level the jamb head. Wedge the sides
with shingles between the jambs and the studs, to align them. Nail
them securely in place. Take care not to wedge the jamb unevenly.

JZGMSAT
QA

SYSTEM

Carpentry NC III

Fabricate/install
door/window

jambs and panels

Date
Developed:
April 1, 2011

Document No.
Issued by:

Page 23 of 46Developed by:
Glenn F.

Salandanan Revision #
____

Similer Documents